Water/Wastewater Treatment
Anacostia Pump Station Replace
Project Details
Owner: DC Water
5000 Overlook Ave. SW
Washington, DC 20032
Start Date: 3/8/2007
Completion Date: 11/21/2008
Type of Work: : Pumping Station
Scope:: This project involved the construction of a new finished water pumping station with twelve new pumping units. The structure included a lower level area, pump room, operations room, electrical room, battery room, generator room, and toilet rooms.
Contact us now
7100 Athens Place Washington, DC 20512-7100
Hotline: 1 234 567 89